The main limiting factor in this solution is the central triangle trackloop which needs pseudo-period 5 instead of 4 in order for the arms to not crash. Hopefully a slightly different layout will fix that. If not I could try using that trackloop only for the last product, and have a second higher latency pipeline for that metal.