I built this solve around the left giant hex arm, it was just too efficient of a way to get a copper triplexed quicksilver. It will be intresting to see how many other solves also use a simular setup. Technical aside: When grabbing the input for the 3rd injection piepline I needed the gap of the +2 cycles to line up with when purification arms reset, as they needed the extra time. The single arm responsable for the grab could not have debonded and moved all the qs out of the way in time for the lead injection, thus resulting in the extra long setup latency at the start of the solve.