Assembly at pseudoperiod of 8. The bottleneck (and potential cycle improvements in this locale) is in two things that are pretty much balanced: passing the water filament to right side so arm 12 can start assembly of first output, and finishing input suppression and starting the dry filament. The track holding arms 5,6,7,8 sorely needs more space for these arms to do work promptly.