If I've calculated correctly (and man, I hope I've calculated correctly!!) - the ratio is 136:15. I must be insane for wanting to give this a go. Some details of my solve (feel free to skip): Silver pipeline: All 136 lead get purified --> 17 copper All 136 tin get purified --> 34 copper 45/51 copper get projected --> 45 silver 6/51 copper get pulled (by the higher track loop) into the gold pipeline Gold pipeline: All 136 iron get purified --> 68 copper 58/68 copper get purified --> 29 silver 10/68 copper get pulled (by the lower track loop) and projected --> 10 silver 39 + 6 silver get projected --> 45 gold The cadence of gold, silver, and quicksilver was so irregular, I found assembly difficult at anything less than 15P. But with an instruction secondary, I knew I needed a shorter period. The only solution I found was to brick enough atoms for all 15 outputs, then deliver those atoms at a regular rhythm. I was able to get everything working at period 4, except for assembly, which I eventually got working at period 8. Enjoy!